Skip to content
DAMREV
Start a Structuring Review

Trust centre

The Five Control Gates

A DAMREV programme moves forward only when a defined check has been passed and recorded. Control gates sit in the fixed five-stage sequence at the points where assessment, approval and review must be separated before an irreversible step is taken. This page shows where they sit and what each passage leaves on the record.

Why gates

Why does a tokenized programme need gates at all?

Because several of its steps cannot be taken back. Once an instrument is minted and relied on, correcting an earlier error is costly and sometimes impossible, and on a public ledger it happens fast: Stellar closes a ledger roughly every five seconds, with finality at close1.

  • Conventional programmeDaysA problem is often found during reconciliation, days after the fact, and repaired by hand.
  • Stellar ledgerAbout five secondsA ledger closes roughly every five seconds, with finality at close1.
  • Soroban contractsSince February 2024Running natively on the Stellar ledger2, so a rule encoded in error is enforced as faithfully as a correct one.
  • Before the stepThe check comes firstA programme that settles on a public ledger does not have the margin a conventional one has. The check therefore has to happen before the step, and the person who passes it has to be someone other than the person who prepared it.
  • The platform's own checksSome checks need no personForge issues only after Veritas and Sentinel have cleared eligibility, and it reads Beacon's mint circuit-breaker signal before any issuance, so a doubtful reserve reading stops a mint rather than being minted against.
  • What it answersControlled as any security isStaff of the Securities and Exchange Commission (SEC) have stated that the format of issue does not change how the federal securities laws apply3.

The sequence

Where in the programme do the gates sit?

Inside the fixed sequence every programme follows, at the points where one stage's work must pass assessment and approval before the next stage relies on it. The sequence is the same for every asset class; what changes is the asset and its legal treatment.

  1. The asset and the claim

    What is financed, and what the investor will hold a claim on, assessed before any structure is drawn.

    Gate 1

    The asset and claim gate

    Before any structure is drawn.

    • Assessor
    • Approver
    • Reviewer, if adverse
  2. The structure

    The vehicle, the ranking and the control framework, approved before any rule is encoded.

    Gate 2

    The structure gate

    Before any rule is encoded.

    • Assessor
    • Approver
    • Reviewer, if adverse
  3. The instrument

    The rights and rules to be encoded, checked against the transaction documents.

    Gate 3

    The instrument gate

    Before the instrument goes to issuance.

    • Assessor
    • Approver
    • Reviewer, if adverse
  4. Issuance and the register

    Minting under the authority of the licensed entity for the programme, and the register of holders.

    Gate 4

    The issuance gate

    Before any instrument is minted.

    • Veritas
    • Sentinel
    • Beacon
    • Forge
    • Assessor
    • Approver
    • Reviewer, if adverse

    Forge will not mint until Veritas and Sentinel clear eligibility, and it reads Beacon's circuit-breaker signal before any issuance. Issuance is performed by the licensed entity for that programme, which is not DAMREV.

  5. Servicing for life

    Every lifecycle event after issuance, under the same approval paths.

    Gate 5

    The lifecycle gate

    Before each lifecycle event takes effect.

    • Assessor
    • Approver
    • Reviewer, if adverse

The limit

The criteria for each of the five gates, and what must be evidenced to pass each one, are not described on this page. They sit in the DAMREV Standard, the versioned operating standard that governs how programmes are researched, structured, encoded and governed, and how approval is separated from assessment.

Passing a gate

Who decides that a gate has been passed?

Never the person who did the work. An assessor drafts the assessment, a separate approver signs it off, and on adverse or below-floor decisions a third reviewer is added. Four eyes and six eyes set which of those paths each class of decision follows.

Follow one decision. The assessor drafts, then The approver signs, then The gate is passed. Choose a decision and follow it through the gate.
  • Follow one decision
  • The assessor drafts: The assessment is prepared and its inputs are attached to the record.
  • The approver signs: A different person approves it, on the same inputs, and is named.
  • The gate is passed: The decision is recorded and the next stage may rely on it.
Follow one decision. The assessor drafts, then The approver signs, then The gate is passed. Choose a decision and follow it through the gate.

Choose a decision and follow it through the gate.

Evidence

What is recorded when a gate is passed?

Enough to reconstruct the decision without asking anyone. Each passage leaves the following on the programme record, so the operating instrument can always be traced back to the terms that authorised it.

  1. 01

    The decision taken, and the stage of the sequence it belongs to.
  2. 02

    The inputs the decision was made on, as they stood at the time.
  3. 03

    The assessor, the approver and, where one was required, the reviewer.
  4. 04

    The version of the DAMREV Standard in force when the decision was taken.
  5. 05

    Any rule encoded as a result, and the date from which it applies.
  6. 06

    For issuance, the entity under whose authority the instrument was minted.

On request

Which documents can I ask for about the gates?

Ask through the contact page and name the programme and your role. Each box below opens the contact page for that request.

Common questions

What else do people ask?

Short answers on the five gates: whether they are the five stages, whether one person can pass a gate in an urgent case, whether DAMREV issues the instrument at the issuance gate, whether the platform can stop a step without a person, and how to verify that a gate was passed.

Are the five gates the same as the five stages?

The gates sit within the five stages, at the points where assessment, approval and review are separated before the programme moves on. The stages describe the work; the gates describe the checks on it.

Can a gate be passed by a single person in an urgent case?

Passing a gate is itself a recorded decision under four eyes or six eyes, so it needs at least an assessor and a separate approver. The person who builds a thing never signs it off.

Does DAMREV issue the instrument when the issuance gate is passed?

Issuance is performed by the licensed entity for that programme, which is not DAMREV. The gate records the decision and the authority under which the instrument was minted.

Can the platform stop a step without a person?

Yes, for the checks it can make itself. Forge will not mint until Veritas and Sentinel clear eligibility, and it reads Beacon's circuit-breaker signal before any issuance.

How do I verify that a gate was actually passed?

Ask for the gate record extract. It names the assessor, approver and any reviewer, lists the inputs, and states the version of the Standard that applied.

References

  1. 1.Chainstack, "What is Stellar". https://chainstack.com/what-is-stellar/ Also: Stellar developer documentation, "Control access to an asset", https://developers.stellar.org/docs/tokens/control-asset-access
  2. 2.Stellar Development Foundation, "Protocol 20 and smart contracts are live on Mainnet". https://stellar.org/blog/developers/protocol-20-and-smart-contracts-are-live-on-mainnet
  3. 3.US Securities and Exchange Commission, Statement on Tokenized Securities, 28 January 2026. https://www.sec.gov/newsroom/speeches-statements/corp-fin-statement-tokenized-securities-012826-statement-tokenized-securities

Last updated:

Ready to build on programmable infrastructure?

Tell us what you want to tokenize. We will show you how DAMREV can run it.